Engineering capability. Clear documentation.

Explore APE SISMICO Private Limited's RDSO approval letters, company registrations, manufacturing resources and personnel information in one place. Our documentation supports technical evaluation and procurement discussions for bridge bearings, expansion joints and infrastructure components.

Ownership details

Overview of Ownership details

Company profile & registrations

APE SISMICO Private Limited was incorporated on 21 May 2018. Review the company particulars, incorporation and GST records, and original constitutional document extracts below.

InformationDetails & supporting documents
Legal entity

Company particulars

APE SISMICO PRIVATE LIMITED; private limited company, limited by shares.
Directors listed in the 2026 employee record
Mr. Ajay Kumar - Operations; Mr. Tanvir Sharif - Sales & Project.
Incorporation
21 May 2018. Corporate Identity Number (CIN): U70109UP2018PTC104478.
GST registration
GSTIN: 09AAQCA9269E1Z3; registration dated 21 June 2018.
Constitutional documents
Memorandum of Association: page 1 of 5. Articles of Association: page 1 of 11. Original image extracts are provided below.
Address recorded in company documents
F-383, M. G. Road Industrial Area, UPSIDC Phase 1, Hapur, Uttar Pradesh 245101.
Office contact information APE SISMICO Private Limited
GST Certificate
Company PAN
Full particulars for Company PAN

Permanent Account Number issued to APE SISMICO PRIVATE LIMITED.

InformationDetails
CompanyAPE SISMICO PRIVATE LIMITED
Permanent Account NumberAAQCA9269E
Date of incorporation / formation21 May 2018
Issuing departmentIncome Tax Department, Government of India
Certificate of Incorporation
Full particulars for Certificate of Incorporation

Certificate of Incorporation issued by the Ministry of Corporate Affairs on 21 May 2018.

InformationPublished record
CompanyAPE SISMICO PRIVATE LIMITED
Corporate Identity Number (CIN)U70109UP2018PTC104478
Date of incorporation21 May 2018
Constitution recordedCompany limited by shares
Issuing authorityMinistry of Corporate Affairs, Central Registration Centre
Recorded mailing addressF-383 UPSIDC M.G. Road, Industrial Area, Phase-1 Hapur, Ghaziabad, Uttar Pradesh 245101
Memorandum of Association - supplied page 1 of 5
Full particulars for Memorandum of Association - supplied page 1 of 5

Original document extract.

InformationPublished record
DocumentSPICe e-Memorandum of Association, INC-33
CompanyAPE SISMICO PRIVATE LIMITED
SRNG83113043
Pages suppliedPage 1 of 5 only (document extract)
Scope on supplied pageCompany name, registered-office state of Uttar Pradesh and company objects including expansion joints, bridge bearings, structural fabrication and bridge rehabilitation
Articles of Association - supplied page 1 of 11
Full particulars for Articles of Association - supplied page 1 of 11

Original document extract.

InformationPublished record
DocumentSPICe e-Articles of Association, INC-34
CompanyAPE SISMICO PRIVATE LIMITED
SRNG83113043
Pages suppliedPage 1 of 11 only (document extract)
Scope on supplied pageInterpretation, private-company provisions and initial share-capital provisions

Manufacturing unit

Overview of Manufacturing unit

Manufacturing for infrastructure applications

APE SISMICO manufactures bridge bearings, expansion joints and structural steel components. Our manufacturing scope also includes drainage spouts, pedestrian bridge structures and gantries, supported by project drawings and the requirements agreed for each enquiry.

Facilities and supporting information

The machinery list and documents below provide information for consultants, procurement teams and vendor assessments. Review the relevant approval letter for its item scope, reference number and conditions. For consolidated company and RDSO documentation, visit our vendor approval page.

For a project-specific capability review, share the component schedule, drawings, material requirements and proposed inspection arrangements with our team.

InformationDetails & supporting documents
Manufacturing location

Unit and facility particulars

F-383, M. G. Road Industrial Area, UPSIDC Phase 1, Hapur, Uttar Pradesh 245101.
Machinery & equipment
The equipment register contains 68 entries covering machining, drilling, moulding, rubber processing, welding, cutting, grinding, lifting, weighing and power generation.
Rubber processing
Rubber-processing and moulding equipment is detailed in the machinery register.
Steel processing
Machining, cutting, drilling, welding and grinding equipment is detailed in the machinery register.
Items covered by the decision letters

Approval and audit register

POT-PTFE bearings: item 3100405, sub-item 3100405001. Elastomeric bearings: item 3100417, sub-item 3100417001. Expansion joints: item 3100421, sub-item 3100421001.
Registration request IDs
POT-PTFE: 7146. Elastomeric bearings: 15064. Expansion joints: 32336.
Annual capacity recorded in the letters
POT-PTFE: 600. Elastomeric bearings: 1,000. Expansion joints: 18,000.
Next quality audit due, as recorded
POT-PTFE: 15 November 2026 (letter dated 16 November 2021). Elastomeric bearings: 28 August 2027 (letter dated 29 August 2022). Expansion joints: 31 March 2031 (letter dated 1 April 2026).
Record details

The original approval letters below set out the item scope and applicable conditions. Audit due dates are distinct from approval-expiry dates.

RDSO approval letters
RDSO Approval — POT-PTFE Bearings - first page
RDSO decision letter

RDSO Approval — POT-PTFE Bearings

Item number
3100405
Annual capacity (as recorded)
600
Decision date
16 November 2021
Next quality audit due
15 November 2026
Full particulars & conditions

Details transcribed from the supplied document. Dates, classifications and capacities below describe that record.

  • Issuing authority: Government of India, Ministry of Railways — RDSO (B&S, Engineering)
  • Document: Final Decision Letter — Decision of Fresh Registration Request
  • Firm: M/s APE SISMICO PRIVATE LIMITED-HAPUR
  • Registered address: F-383, M.G. Road Industrial Area, UPSIDC Phase-1, Hapur, Uttar Pradesh 245101, India
  • Manufacturing unit: APE SISMICO, F-383, M.G. Road Industrial Area, UPSIDC Phase-1, Hapur, Uttar Pradesh 245101, India
  • Item: POT PTFE BEARING
  • Item ID: 3100405
  • Sub-item ID: 3100405001
  • Category recorded in letter: Approved
  • Capacity per annum (as stated): 600
  • Letter reference: RDSO/108/1901/00006229
  • Registration request ID: 7146
  • Request date: 6 October 2021
  • Decision date: 16 November 2021
  • Next quality audit due (as stated): 15 November 2026
  • Digitally signed by: Pradeep Kumar, Director BS IV

The audit due date is not an approval-expiry date. Refer to the complete letter and current vendor record for procurement assessment.

RDSO Approval — Expansion Joints - first page
RDSO decision letter

RDSO Approval — Expansion Joints

Item number
3100421
Annual capacity (as recorded)
18,000
Decision date
1 April 2026
Next quality audit due
31 March 2031
Full particulars & conditions

Details transcribed from the supplied document. Dates, classifications and capacities below describe that record.

  • Issuing authority: Government of India, Ministry of Railways — RDSO (B&S, Engineering)
  • Document: Final Decision Letter — Decision of Fresh Registration Request
  • Firm: M/s APE SISMICO PRIVATE LIMITED-HAPUR
  • Registered address: F-383, M.G. Road Industrial Area, UPSIDC Phase-1, Hapur, Uttar Pradesh 245101, India
  • Manufacturing unit: APE SISMICO, F-383, M.G. Road Industrial Area, UPSIDC Phase-1, Hapur, Uttar Pradesh 245101, India
  • Item: EXPANSION JOINTS
  • Item ID: 3100421
  • Sub-item ID: 3100421001
  • Category recorded in letter: Approved
  • Capacity per annum (as stated): 18,000
  • Letter reference: RDSO/108/1901/00077071
  • Registration request ID: 32336
  • Request date: 5 February 2026
  • Decision date: 1 April 2026
  • Next quality audit due (as stated): 31 March 2031
  • Additional remarks: Comply with revised STR BS-S-7.5.3.1-11, Version 2.0, and submit compliance by its implementation date, 1 May 2026.
  • Digitally signed by: Subhash Chandra, Director III

Conditions recorded in the letter

Changes to office or manufacturing-unit addresses must be notified to the Vendor Approving Authority, RDSO, Lucknow. The letter provides for removal from the approved list if products are unsatisfactory during fabrication or inspection, or if vendor-registration guidelines, STR or specifications are violated.

The audit due date is not an approval-expiry date. Refer to the complete letter and current vendor record for procurement assessment.

RDSO Approval - Elastomeric Bearings - first page
RDSO decision letter

RDSO Approval - Elastomeric Bearings

Item number
3100417
Annual capacity (as recorded)
1000
Decision date
29 August 2022
Next quality audit due
28 August 2027
Full particulars & conditions

Particulars transcribed from the supplied decision letter. The next audit date is not an approval-expiry date.

InformationPublished record
ItemELASTOMERIC BEARINGS
Item ID3100417
Sub-item ID3100417001
Category recorded in letterApproved
Capacity per annum (as stated)1000
Letter referenceRDSO/108/1901/00024311
Registration request ID15064
Request date25 June 2022
Decision date29 August 2022
Next quality audit due (as stated)28 August 2027
Registered addressF-383, M. G. Road Industrial Area, UPSIDC Phase-1, Hapur, Uttar Pradesh 245101
Manufacturing unitAPE SISMICO, F-383, MG Road Industrial Area Phase-1, UPSIDC Hapur, Uttar Pradesh 245101
Additional remarksChanges to office or manufacturing-unit address must be reported to Director General B&S, RDSO, Lucknow. The letter records possible removal from the approved list for unsatisfactory product quality during fabrication/inspection or other violations referenced in RDSO ISO apex documents.
Digitally signed by (as printed)Pradeep Kumar, Director BS IV
Machinery & equipment list
Full particulars for Machinery & equipment list

The supplied three-page machinery register lists 68 entries covering machining, drilling, moulding, rubber processing, welding, cutting, grinding, lifting, weighing and power generation.

  • Company: APE SISMICO PVT. LTD.
  • Document: List of Machinery — 3 pages
  • Total listed entries: 68
  • Equipment identification: Individual machine numbers, makes and capacities are transcribed below.

Browse the equipment register below. Machine identifiers, makes and capacities follow the original document.

No.MachineMachine no.MakeCapacity as recorded
1Lathe machineLM-1Vishal20 in × 8 ft
2Lathe machineLM-2Vishal24 in × 8 ft
3Lathe machineLM-3Vishal24 in × 8 ft
4Lathe machineLM-4Vishal14 in × 6 ft
5Lathe machineLM-5Syndicate machine24 in × 8 ft
6Vertical turret latheVTLM-6Webster & Bennett36 in
7Horizontal boring machineHBM-7S. ROCCO75 mm
8Radial drillRD-8Vishal38 mm dia.
9Drill machineDM-9Nanda25 mm dia.
10Magnetic drillDM-10Bosch50 mm dia.
11Magnetic drillDM-11Bosch50 mm dia.
12Magnetic drillDM-12Dangcheng50 mm dia.
13Magnetic drillDM-13Dangcheng50 mm dia.
14Shaper machineSM-14Vishal36 in
15Planer machinePM-15MAXIMA3 ft × 8 ft
16Milling machineMM-16Matharoo28 in
17Bed-type milling machineMM-17Derico71 in × 26 in
18Test pressTP-18Kanwar2000 mt (as printed)
19Band saw (listed as Bend Saw)BS-19New8 in
20Chop sawCS-20Tuftul14 in
21Kneader machineKM-21SLACH640 × 580 mm
22Open mixing millOMM-22Mahashkti10 × 24 in
23Molding pressMP-23Amruta—
24Molding pressMP-24Amruta730 × 600 mm
25Molding pressMP-25Amruta730 × 600 mm
26Molding pressMP-26Amruta1100 × 950 mm
27Molding pressMP-27Amruta1050 × 910 mm
28Molding pressMP-28Amruta650 × 450 mm
29MIG welding machineMW-29Electra400 A
30MIG welding machineMW-30Electra250 A
31MIG welding machineMW-31Steller400 A
32Arc welding machineAW-32Electra400 A
33Arc welding machineAW-33Makweld250 A
34Arc welding machineAW-34Electra200 A
35Pug cutting machinePC-35Esaab400 Apm (as printed)
36Oxy-acetylene gas cutting machineGC-36AshaNot specified
37Buffing machineBM-37Elephant3300 RPM
38Bench grinderBG-38Panasonic8 in
39Bench grinderBG-39Black & Dacker6 in
40Air compressorAC-40Super Moter7 HP
41Air compressorAC-41Groz3 HP
42Angle grinderAG-42Bosch7 in
43Angle grinderAG-43Bosch7 in
44Angle grinderAG-44Skill7 in
45Angle grinderAG-45Eastman5 in
46Angle grinderAG-46Bosch—
47Angle grinderAG-47Bosch4 in
48Angle grinderAG-48Black & Dacker4 in
49Angle grinderAG-49Bosch4 in
50Overhead craneOC-50Liftboy5 ton
51Overhead craneOC-51Liftboy5 ton
52Overhead craneOC-52Liftboy3 ton
53Overhead craneOC-53Liftboy3 ton
54Automatic weighing machineWM-54Raja500 kg
55Hammer drillHM-55Hilti13 mm dia.
56Hammer drillHM-56Hilti13 mm dia.
57Hammer drillHM-57Hilti13 mm dia.
58Hammer drillHM-58Bosch13 mm dia.
59Hammer drillHM-59Black & Dacker13 mm dia.
60Hammer drillHM-60Black & Dacker13 mm dia.
61Hammer drillHM-61Black & Dacker13 mm dia.
62Breaker machineBM-62Bosch16 kg
63Breaker machineBM-63Bosch16 kg
64Breaker machineBM-64Bosch5 kg
65Breaker machineBM-65Bosch5 kg
66Diesel generatorDG-66Kirlosker82.5 kVA
67Diesel generatorDG-67Kirlosker125 kVA
68CNCCNC-68JYOTI—

For project-specific manufacturing requirements, contact our technical team.

Firm's registration & quality

InformationDetails & supporting documents
Udyam registration

Registration and licensing particulars

UDYAM-UP-76-0002463; registered 15 May 2021.
Enterprise classification
Small for 2025-26, with classification date 1 April 2025, as recorded in the certificate printed 29 August 2025.
Major activity
Manufacturing.
Company incorporation
21 May 2018; CIN U70109UP2018PTC104478. The incorporation certificate is included under Ownership details.
OHMS Certificate
Full particulars for OHMS Certificate

Details transcribed from the supplied document. Dates, classifications and capacities below describe that record.

  • Company: APE SISMICO PRIVATE LIMITED
  • Certified location: F-383, M.G. Road Industrial Area, Phase-1, UPSIDA, Hapur, Ghaziabad, Uttar Pradesh 245101, India
  • Standard: ISO 45001:2018
  • Management system: Occupational Health & Safety Management Systems
  • Certificate number: E20260347266
  • Certification body: Royal Assessments Pvt. Ltd. (RAPL)
  • Certification date: 3 March 2026
  • First surveillance on or before: 2 March 2027
  • Second surveillance on or before: 2 March 2028
  • Valid until (as printed): 2 March 2029

Scope recorded

Expansion joints and bridge bearings: POT, pin, metallic guided and sliding, spherical, rocker and rocker-cum-roller, knuckle (printed as “KNUCLE”) and elastomeric bearings.

Issuer and verification

  • Issuer address: 623 A, Tower-B, iThum, Plot No. A-40, Sector-62, Noida 201301, India
  • Issuer website: www.royalapl.com
  • Issuer email: info@royalapl.com
  • Issuer telephone: 01146107691
  • Verification site stated: www.iafcertsearch.org
  • CAB number printed: 119012
  • Accreditation statement in certificate: RAPL is accredited by EGAC, Egypt; EGAC is stated to be an IAF member and MLA signatory.

The certificate states that continued validity depends on successful surveillance audits. It remains the property of Royal Assessments Pvt. Ltd. and must be returned on request or withdrawal.

EMS Certificate
Full particulars for EMS Certificate

Details transcribed from the supplied document. Dates, classifications and capacities below describe that record.

  • Company: APE SISMICO PRIVATE LIMITED
  • Certified location: F-383, M.G. Road Industrial Area, Phase-1, UPSIDA, Hapur, Ghaziabad, Uttar Pradesh 245101, India
  • Standard: ISO 14001:2015
  • Management system: Environmental Management Systems
  • Certificate number: E20260347265
  • Certification body: Royal Assessments Pvt. Ltd. (RAPL)
  • Certification date: 3 March 2026
  • First surveillance on or before: 2 March 2027
  • Second surveillance on or before: 2 March 2028
  • Valid until (as printed): 2 March 2029

Scope recorded

Expansion joints and bridge bearings: POT, pin, metallic guided and sliding, spherical, rocker and rocker-cum-roller, knuckle (printed as “KNUCLE”) and elastomeric bearings.

Issuer and verification

  • Issuer address: 623 A, Tower-B, iThum, Plot No. A-40, Sector-62, Noida 201301, India
  • Issuer website: www.royalapl.com
  • Issuer email: info@royalapl.com
  • Issuer telephone: 01146107691
  • Verification site stated: www.iafcertsearch.org
  • CAB number printed: 119012
  • Accreditation statement in certificate: RAPL is accredited by EGAC, Egypt; EGAC is stated to be an IAF member and MLA signatory.

The certificate states that continued validity depends on successful surveillance audits. It remains the property of Royal Assessments Pvt. Ltd. and must be returned on request or withdrawal.

Udyam Registration Certificate - printed 29 August 2025
Full particulars for Udyam Registration Certificate - printed 29 August 2025

Udyam registration certificate, printed 29 August 2025. Classification and dates are shown as recorded.

InformationPublished record
RegistrationUDYAM-UP-76-0002463
EnterpriseM/S APE SISMICO PRIVATE LIMITED
Classification in this certificateSmall for classification year 2025-26; classification date 1 April 2025
Previous classifications listedSmall: 2024-25 (27 April 2024); Micro: 2023-24 (9 May 2023), 2022-23 (26 June 2022)
Major activityManufacturing
Social category of entrepreneurGeneral
Unit named on certificateAPE SISMICO PVT LTD; Udyog Aadhaar Memorandum UP76A0005151
Official address in certificateF-383, UPSIDC, M G Road, Phase-1, Industrial Area, Hapur, Uttar Pradesh 245101
Date of incorporation / registration of enterprise21 May 2018
Date of commencement of production/business as printed14 May 2025
Date of Udyam registration15 May 2021
NIC code25999 - Manufacture of other fabricated metal products n.e.c.
Certificate print date29 August 2025
Factory licence - UPFA75002757
Full particulars for Factory licence - UPFA75002757

Factory registration and licence for the Hapur manufacturing premises.

InformationDetails
Registration numberUPFA75002757
AuthorityLabour Department, Uttar Pradesh; issued on behalf of the Director of Factories
DocumentForm No. 3, Rule 7(1): Registration and Licence to Work a Factory under Section 6 of the Factories Act, 1948
Licence holderAjay Kumar
Licensed premisesA P E SISMICO PVT LTD, Plot No. F-383, M G Road Industrial Area, Phase-I, UPSIDC, Hapur, Uttar Pradesh 245101
Validity as printed8 October 2026 to 7 October 2031
Licensed employment limitNot more than 50 persons on any one day
Licensed motive power limitNot exceeding 100 H.P.
Approved plan referenceSPR00009484, dated 8 October 2020
Licence fee recordedINR 9,375.00

Validity is subject to the conditions printed in the licence, including applicable Fire Department and U.P. Pollution Control Board NOCs. The employment and power figures are licensed limits. Refer to the original document for the full terms.

ISO 9001:2015 - Quality management certificate
Full particulars for ISO 9001:2015 - Quality management certificate

Quality management system certificate. Validity is subject to successful completion of surveillance audits by the printed due dates, as set out in the original certificate.

InformationDetails
CompanyAPE SISMICO PRIVATE LIMITED
StandardISO 9001:2015
Certificate numberIBP2547097
Certification bodyInterglobal Business Process Private Limited
Certified locationUPSIDA M.G. Road, F-383, Industrial Area, Phase 1, Hapur, Uttar Pradesh 245101, India
Issue date17 April 2025
Expiry date as printed16 April 2028
First surveillance audit due16 March 2026
Second surveillance audit due16 March 2027
ScopeManufacture of expansion joints for bridges and buildings, bridge bearings and other bridge accessories; fabrication of steel trusses and foot overbridges; repair and rehabilitation of bridges; provision of road signages and gantry structures
Accreditation stated on certificateKorean Accreditation Board; KAB-QC-79
ISO 3834-2:2021 - Welding quality certificate
Full particulars for ISO 3834-2:2021 - Welding quality certificate

Certificate covering quality requirements for fusion welding of metallic materials. Validity is subject to maintaining the system to the required standard, as stated in the certificate. This PDF preserves the original certificate image.

InformationDetails
CompanyAPE SISMICO PRIVATE LIMITED
StandardISO 3834-2:2021
Certificate numberUK-ASPL-1625
Certification bodyUK Certification & Inspection Limited
Certified locationF-383, MLG Road Industrial Area, Phase-1, UPSIDC, Hapur, Ghaziabad, Uttar Pradesh 245101, India
Certification date5 July 2025
Expiry date as printed4 July 2028
First surveillance due5 July 2026
Second surveillance due5 July 2027
Quality requirementsFusion welding of metallic materials
Product / service rangeExpansion joints; POT, pin, metallic guided and sliding, spherical, rocker and rocker-cum-roller and knuckle bearings; steel trusses and foot overbridges

Organisation chart

Overview of Organisation chart

People behind our engineering

Our organisation brings together operations, design, production, quality and project delivery with commercial and administrative support. Explore the company structure and the 2026 personnel register below.

InformationDetails & supporting documents
Organisation structure

Organisation and personnel particulars

The organisation chart outlines responsibilities across operations, sales, production, quality, design, administration and project delivery.
Plant leadership
Mr. C. L. Roy is listed as Factory incharge / Plant Head in the 2026 employee record.
Personnel & qualifications
The 2026 employee list includes 23 personnel with their designation, department, qualification and stated experience. The full table and original document are provided below.
Organisation Chart
Full particulars for Organisation Chart

The organisation chart presents the operational and commercial reporting structure, including factory management, quality assurance, production, purchasing, design, human resources, accounts, projects and regional sales.

Employee list - 2026
Full particulars for Employee list - 2026

Meet the personnel listed in our 2026 employee record. The table presents 23 team members across operations, engineering, quality, project delivery and business support, with qualifications and experience as recorded.

No.NameDesignationDepartmentExperience (years, as stated)Qualification
1Mr. Ajay KumarDirectorOperation21B.E. (Mech.) & MBA (H.R.M.)
2Mr. Tanvir SharifDirectorSales & Project14PGDM (Marketing)
3Mr. C. L. RoyFactory inchargePlant Head25M.Com
4Rashid IqbalManagerSales & Project12B. Tech (Mech)
5Mr. Vijay Pal SinghRubber TechnologistQ A & R & D20.5PGDIRI (Rubber Technologist)
6Mrs. Pooja KumarManagerH R4M.A. & P.G.D.C.A.
7Mrs. Anjum BanoManagerProject2B.A.
8Miss Aakrti BhargavaEngineerDesign7B. Tech (Mech.)
9Gaurav PandayEngineerDesign1.5Diploma (Mech)
10AnuragEngineerDesign1.5B. Tech (Mech)
11Mohd. MustkeemSite EngineerProject5Diploma (Civil)
12Mr. Lavish SharmaAsst. ManagerProduction4B. Tech (Mech)
13Mr. Ankit KumarEngineerProduction2B. Tech (Mech.)
14Mr. Kush KumarEngineerQ A2.5B. Tech (Mech.)
15Mr. RajatEngineerQ A3B. Tech (Mech)
16Prince TyagiEngineerQ A3Diploma (Mech)
17Mr. AmitEngineerQ A2Diploma (Mech)
18NeleshChemistLab Incharge15MSC (Chemistry)
19Mr. VijendraAccountantAccount6B. Com
20Mr. KrishnaSuperviserQ A810th
21Mr. SatishSuperviserProduction510th
22Mr. Amit NagarStore InchargeStore5B. Com
23Mr. DilshadStore ExecutiveStore110th

Testing facilities

Overview of Testing facilities

Quality begins with clear requirements

Our quality commitment centres on customer requirements, quality systems and continual improvement in production processes. Testing and inspection requirements form part of the technical discussion for each product or project.

Define the inspection scope

Please share the applicable specification, component drawings and required inspection or test plan. This allows the equipment, testing arrangements and supporting records needed for your enquiry to be identified.

  • Product type, dimensions and relevant drawing revisions.
  • Required tests, acceptance criteria and witnessing arrangements.
  • Material documentation and traceability requirements.
  • Calibration records or other information requested for vendor assessment.

Contact our team for current testing facility information and documents relevant to your enquiry.

InformationDetails & supporting documents
Calibration document archive

Testing and calibration particulars

22 instrument records from Pascal Physical Laboratory LLP, covering calibration on 14 July 2025. Next due / suggested calibration date recorded: 13 July 2026.
Equipment covered
Pressure gauges, calipers, steel scales, measuring tape, dial gauges, coating-thickness gauge, hardness tester, ammeters, temperature controllers, weighing balance, angle protractor and tensile testing machine.
Record details

View the archived instrument records below for certificate references, ranges and measurement results.

PG-01, PG-02, PG-03

Historical calibration records - July 2025

Dial pressure gauges
ASPL-03, ASPL-04
Vernier calipers
ASPL-05, ASPL-06
Metric steel scales
ASPL-07
Measuring tape
DG-01 to DG-05
Plunger dial gauges
CM-01
Coating thickness gauge
HT-01
Shore A hardness tester
ASPL-02, ASPL-01
Welding machine DC ammeters
DTC-01, DTC-02
Temperature controllers
WB-01
Digital weighing balance
AP-01
Angle protractor
TM-01
Tensile testing machine
Record details

Calibration archive: 14 July 2025. Next due / suggested calibration date recorded: 13 July 2026.

The supplied 22-page file records calibration on 14 July 2025 for APE SISMICO PVT. LTD., Hapur. The laboratory named in the records is Pascal Physical Laboratory LLP.

Open the original file for individual certificate references, ranges, measurement results and conditions.

Historical calibration records - July 2025

Power supply

InformationDetails & supporting documents
Sanctioned electrical load

Electrical supply particulars

54 kVA
Electricity supplier
Paschimanchal Vidyut Vitaran Nigam Ltd. (PVVNL)
Discuss your requirements

Define the next step for your project.

Talk to our team